Bathroom Remodeling – Phase I

It’s been just over a week since the bathroom remodeling started, here is what it is looking like so far.

This is where we started…

100_5030 (768x1024) 100_5031 (768x1024) 100_5032 (768x1024) 100_5033 (1024x768) 100_5034 (768x1024) 100_5035 (1024x768) 100_5036 (768x1024) 100_5037 (768x1024) 100_5038 (768x1024) 100_5039 (1024x768)

After removal of the old floor, toilet and tub. They also took off the baseboard, numbering each piece to go back in the same location.

100_5040 (768x1024) 100_5041 (1024x768) 100_5042 (768x1024) 100_5043 (1024x768)

 

Here is where they ran into a surprise while taking out the old tub. Seems that when they built the place, someone tried to run a water supply line where a waste line was already placed. How did they fix it? Just run the line up through the floor next to the wall, instead of inside the wall. (Note the old hole drilled in the baseplate where the water line was suppose to run.)

100_5044 (768x1024) 100_5045 (1024x768) 100_5046 (1024x768) 100_5047 (1024x768)100_5048 (1024x768)100_5049 (768x1024)

Here is the new tub installed. They put up temporary plastic so we could use our only shower for the weekend.

 

100_5050 (768x1024) 100_5051 (1024x768) 100_5052 (768x1024)

Tiling has started. Hope to get the rest of the walls and floors done in the next few days.

100_5053 (768x1024) 100_5054 (768x1024)

Things are going well. More Later.